Home Gym Backlog: That’s What’s Left to Do
Wednesdays are my “no work” days, however I took a second to take stock of the remaining tasks within the room. My unique purpose was to complete this room by the tip of February. Will I make my purpose? Nicely, let’s check out what nonetheless must be completed.
First, these transition tracks nonetheless want work. I made a decision to dye them to match the carpet, so this must be fast and simple.
The complete perimeter of the room nonetheless wants 1 / 4 flip.

I do not need the curtains to pile up on the ground, so that they have to be fenced. And I hold forgetting that I’ve a ceiling fan for this room. I want to put in this.

The Swedish ladder has been arrange, however I nonetheless need to stain the picket bars and want to determine the way to connect this heavy factor securely to the wall. That will probably be a problem.

The 2 bed room doorways nonetheless want portray (I am protecting them white), and the lavatory door wants a deal with.

The closet space nonetheless would not have lights (however the wiring is there), and I have to make a canopy for the attic.

The close by space nonetheless wants a bit of labor. I want to determine what to do with {the electrical} panel. It has a canopy to placed on, however so what? Hold it that terrible grey metallic shade? To color?
I additionally want a TV to go over the dresser, dangle the 2 wall mirrors subsequent to the dresser, and construct shelving. I’ve modified my thoughts concerning the design of the cabinets, however I will share extra particulars later.

On the entrance to the lounge, the portray on the ceiling nonetheless wants some ending touches, and the door wants portray. I additionally want so as to add the wiring and junction field for the brand new gentle after which set up the sunshine. I need to add art work to the partitions, and the change plates and two extra outlet covers have to be painted and put in.

The black chest of drawers within the closet goes to get a makeover.

And at last, I need to paint Matt’s Theracycle (his train bike), which is an off-white shade. I need it to be black.
It looks as if rather a lot to do, and if I need to attain my purpose, I’ve six days to do all of it! I can not assure that I’ll succeed, however I’ll positively strive! Right here is the record in a straightforward to learn format:
- Stain Transition Strips
- Set up and paint quarter flip baseboards
- sew the curtains
- Set up the ceiling fan
- Connect the Swedish ladder to the wall
- Paint the 2 doorways white
- Add door-to-door deal with between fitness center and toilet
- Set up closet lights
- Cowl the outlet within the attic
- Discover out what to do with {the electrical} panel cowl
- Purchase TV and dangle on the wall above the dresser
- Grasp full-length mirrors flanking the dresser
- Make cabinets for the closet space
- Add wiring and junction field for the sunshine on the entrance to the room
- Set up gentle on the entrance to the room
- Contact up paint on the ceiling on the entrance to the room
- Paint and set up change plates and outlet covers
- Give the dresser a makeover
- Paint Matt’s Theracycle

Addicted 2 Adorning is the place I share my DIY and adorning journey as I transform and adorn the 1948 fixer-upper that my husband, Matt, and I bought in 2013. Matt has MS and is unable to do bodily labor, so I do most of it. do the house responsibilities alone. You will discover out extra about me right here.
I hope you’ll be a part of me on my DIY and adorning journey! If you wish to hold observe of my tasks and progress, you may subscribe beneath and have every new publish delivered to your e mail inbox. That method, you may by no means miss a factor!
#House #Fitness center #Backlog #Whats #Left